Dormer
FROM £48k
A flat-roof extension off the rear of the existing roofline. Most common option on Victorian terraces. Adds a double bedroom and bathroom. Typically 6 weeks.
SW18 · EST. 2013 · 480 CONVERSIONS
Dormer, hip-to-gable, L-shape and mansard, across south-west London. Fixed price contract before we begin. ARB-registered architect on every project.
Every conversion starts with an empty roof void and a hatch. This is project 0473, a 6 week dormer in Earlsfield.
We do not extend kitchens. We do not knock through. We do lofts, and we do four kinds of loft.
Dormer
FROM £48k
A flat-roof extension off the rear of the existing roofline. Most common option on Victorian terraces. Adds a double bedroom and bathroom. Typically 6 weeks.
Hip-to-gable
FROM £62k
Replaces a sloped side roof with a vertical gable wall. Adds a meaningful amount of head height in semi-detached and end-of-terrace homes. Often paired with a rear dormer.
L-shape dormer
FROM £74k
An L-shape rear extension wrapping around the rear closet wing. Suited to Victorian terraces with rear projections. Gets you two bedrooms and a bathroom in one go.
Mansard
FROM £92k
A full reconstruction of the roof at 70 degrees, slate clad with lead flashings, three dormer windows. Maximum volume. The right choice for period properties in conservation areas.
From the first site visit to the snagging revisit at six months. Twelve to twenty weeks end to end, depending on type.
01
Site visit
Free, 45 minutes, on your roof, by Jamie or Anya. Measured up, walked through the options.
02
Fixed price
Within 5 working days of the site visit. One number, broken out by stage. No re-quoting later.
03
Architect drawings
By our in-house ARB-registered architect. Includes planning drawings and building regs structural set.
04
Planning or PD
We file. We chase. We deal with the planning officer. Most projects are permitted development, typical turn-around 8 weeks.
05
Party wall
We serve notices, agree awards, and pay for the adjoining surveyor where required. Included in the fixed price.
06
Pre-start meeting
A week before we lift the first tile. We agree access, parking, skip placement, working hours, dust protocol.
07
Build
One project manager, one lead carpenter, on site every day. Weekly written update with photographs.
08
First fix
Structure, insulation, electrics, plumbing first fix. Building control inspection at this stage.
09
Second fix and finish
Plastering, joinery, decoration, final fix electrics and plumbing. Final building control sign-off.
10
Snagging at six months
We come back. Anything that has moved, settled, or wants adjusting, we do. No charge, no quibble.
SW18 · Magdalen Road
SW15 · Hazlewell Road
SW6 · Bishops Road
FOUNDER, MD
Jamie Salter
12 years on the roof. Started the business in 2013 after eight years at a Wandsworth builder. Quotes most jobs personally.
FMB. Site Supervisor's Safety. CITB SMSTS.
ARCHITECT
Anya Chen
ARB-registered, six years at Allies and Morrison before joining Headroom. Draws every project we build. In-house.
ARB. RIBA Chartered. Part 3 qualified.
PROJECT MANAGER
Tom Beasley
Twenty years of loft conversions, eight at Headroom. Runs three concurrent projects, on site every day, weekly client updates.
CSCS. NVQ 7 Construction.
LEAD CARPENTER
Rauls Vītols
Trained in Riga, twelve years in London. The roof goes off and on under his eye. Every job, no exceptions.
City and Guilds Level 3. NVQ Carpentry.
ONE PROMISE
If the price changes after the contract is signed, the additional cost is on us. Not the client.
There is no clause that lets us pass on a surprise. We have been quoting lofts for twelve years. We know what is in the roof.
Five working days from your first email to a fixed price. We visit you free of charge.